[1]
2020. Fuzzy logic modelling to predict the level of geotechnical risks in rock Tunnel Boring Machine (TBM) tunnelling. Rudarsko-geološko-naftni zbornik. 35, 2 (Jan. 2020). DOI:https://doi.org/10.17794/rgn.2020.2.1.