[1]
“A methodology for truck allocation problems considering dynamic circumstances in open pit mines, case study of the Sungun copper mine”, Rud.-geol.-naft. zb., vol. 34, no. 4, Sep. 2019, doi: 10.17794/rgn.2019.4.6.